Taxpayers to dig for £20M for Liverpool Dock


Non-Believer

Recommended Posts

13 minutes ago, John Wright said:

IMG_5299.jpeg

Oddly enough...as posted, I was on Mxn to Heysham on Sunday. Apart from the expected when pulling away from the Douglas pier and manouvering in Heysham harbour, it was vibration free except for on the approach to Heysham, and still some way out, when there was some noticeable shuddering set in. Whether this was to do with slowing the boat for the approach, I don't know but it was certainly noticeable and out of place with the rest.

Link to comment
Share on other sites

2 hours ago, John Wright said:

BBC this week. Herald and Scotsman in September/October 2023.

BBC Oct 22 £91m (will only have gone up since) - https://www.google.com/amp/s/www.bbc.co.uk/news/uk-scotland-glasgow-west-63135023.amp

 

Scotsman again '22 but £105m - https://www.scotsman.com/news/transport/two-new-calmac-ferries-for-islay-to-be-built-in-turkey-3607547

 

No mention of £30m...

Link to comment
Share on other sites

  • 4 weeks later...
  • 2 weeks later...
12 hours ago, Andy Onchan said:

I mean it's not quite as bad, but DOI failed to have the Edward Pier ready for use by Manxman... resulting in it having to go to sea, and burn all those carbons, because it couldn't be tied up alongside in a storm.

Link to comment
Share on other sites

  • 3 weeks later...

Meanwhile, in other dock side news.  

https://www.manxradio.com/news/isle-of-man-news/king-edward-viii-pier-project-delayed-until-after-tt/

 

'Unforeseen issue with depth of bedrock to blame

Delays caused by uneven bedrock at the end of the King Edward VIII Pier will set back a project to upgrade the site by several months.'

 

Edited by x-in-man
Link to comment
Share on other sites

The original cost estimate for this work was £6.61M.

What is now the estimated time of completion?

Strains of Liverpool Terminal....

Link to comment
Share on other sites

1 minute ago, Non-Believer said:

The original cost estimate for this work was £6.61M.

What is now the estimated time of completion?

Strains of Liverpool Terminal....

I'll bid you £12.5M as the next estimate and climbing.

Link to comment
Share on other sites

1 hour ago, x-in-man said:

Meanwhile, in other dock side news.  

https://www.manxradio.com/news/isle-of-man-news/king-edward-viii-pier-project-delayed-until-after-tt/

 

'Unforeseen issue with depth of bedrock to blame

Delays caused by uneven bedrock at the end of the King Edward VIII Pier will set back a project to upgrade the site by several months.'

 

So - someone got their sums wrong. . ..  right?

Link to comment
Share on other sites

How can it be unforeseen, surely this should have been picked by earlier surveys and what consultants were involved in this fiasco. When can we ever get something built on time and on price ( never).  Next thing Harbour users will be getting stung for more harbour dues.

  • Like 1
Link to comment
Share on other sites

Just now, Two-lane said:

Or someone did not complete an adequate survey in order to find the unknown unknowns.

I can’t believe I am reading ‘test boreholes’ after the project started. What the actual… 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...