23 hours ago, Declan said:

It was better before the train line went there. You'd get off the boat and get onto a bus to Lancaster Station.

Technically the train line went there from 1904.  It's a complicated history though:

The station was opened as Heysham Harbour by the Midland Railway on 11 July 1904. It was relocated to an adjacent site on 4 May 1970, and served boat trains for Belfast until the closure of the ferry route in April 1975. The train service was withdrawn on 6 October 1975, but reinstated, and the station renamed Heysham Sea Terminal on 11 May 1987, to provide a rail connection with the daily sailing to Douglas run by the Isle of Man Steam Packet Company. The station was renamed Heysham Port on 28 September 1992, under the Regional Railways sector of British Rail.

22 hours ago, Two-lane said:

There is a 50% increase in the summer passenger capacity. Some will be with a car, but nevertheless they're goin' to need a bigger bus (or train).

That's what always puzzled me about increasing the number of passengers.  For most of the time the passenger capacity on the Ben (275 cars, 636 pax) was never reached because car spaces filled up first and after the associated passengers were taken in account there were never enough foot passengers to make up to the maximum.   But most of the capacity increase on the Manxman (237 cars, 948 pax) has been in extra pax.  There's also space for 75 trailers, some of which could be used for busy periods for extra car space, but it seems an odd priority, unless they're hoping to do much more from Liverpool.  And if that's the case it would mean running a separate freight operation.

Link to comment
Share on other sites

14 hours ago, Roger Mexico said:

There's also space for 75 trailers, some of which could be used for busy periods for extra car space, but it seems an odd priority, unless they're hoping to do much more from Liverpool.  And if that's the case it would mean running a separate freight operation.

Which is why there will be either the Arrow or Ben available as back up. UA says Ben, but she needs too much spent to be brought up to most recent emissions regulations. SPCo want to get rid and use Arrow.

Problem with that is that such a move reduces passenger and car capacity resilience 

  • Like 1
Link to comment
Share on other sites

1 hour ago, John Wright said:

Which is why there will be either the Arrow or Ben available as back up. UA says Ben, but she needs too much spent to be brought up to most recent emissions regulations. SPCo want to get rid and use Arrow.

Problem with that is that such a move reduces passenger and car capacity resilience 

Now it's government owned should we be going for N-2  like Manx Utilities? 3 boats just in case.

Link to comment
Share on other sites

56 minutes ago, Mercenary said:

No freight, limited winter capability

Im well aware, but it fits your first post.

Personally I favour Mx, Arrow, and 2 of these. A proven design, 450 pax, 100 cars or mix cars/freight.

They could serve Liverpool all year around, Heysham, with Arrow, in winter, and Dublin and Belfast in summer, leaving Mx for summer fair weather sailing.

Get rid of Ben and Manannan.

CalMac have 4 on order from Turkey

There are 6 or 7 serving Turkish routes.

They are £30m each.

IMG_5298.jpeg

  • Like 1
Link to comment
Share on other sites

1 hour ago, John Wright said:

Im well aware, but it fits your first post.

Personally I favour Mx, Arrow, and 2 of these. A proven design, 450 pax, 100 cars or mix cars/freight.

They could serve Liverpool all year around, Heysham, with Arrow, in winter, and Dublin and Belfast in summer, leaving Mx for summer fair weather sailing.

Get rid of Ben and Manannan.

CalMac have 4 on order from Turkey

There are 6 or 7 serving Turkish routes.

They are £30m each.

IMG_5298.jpeg

"Each New Islay Ferry (NIF) is understood to cost £52.5 million, with a further £17 million being spent on dredging and pier upgrades to accommodate them" https://mullandionaferrycommittee.org/islay-presentation-bias-assumption-and-error/

& 27 crew for each

So well over £10m p/a in capital cost for fleet their before any interest 

Staff costs ££££

 

Gain?

 

Link to comment
Share on other sites

1 hour ago, Andy Onchan said:

I can see the Turkish orders going the same way as Ferguson, over budget and inferior materials.

First one will be launched in March and all 4 delivered before end 2025.

The total value of the contract for the 4 is £117million.

 

Link to comment
Share on other sites

7 minutes ago, John Wright said:

First one will be launched in March and all 4 delivered before end 2025.

The total value of the contract for the 4 is £117million.

 

Or roughly four ships for one tin shed ! LOL

  • Thanks 1
Link to comment
Share on other sites

15 minutes ago, John Wright said:

First one will be launched in March and all 4 delivered before end 2025.

The total value of the contract for the 4 is £117million.

 

Source? Google says £91-109m for 2 of the vessels you quote at '£30m'

Link to comment
Share on other sites

22 hours ago, Roger Mexico said:

That's what always puzzled me about increasing the number of passengers.  For most of the time the passenger capacity on the Ben (275 cars, 636 pax) was never reached because car spaces filled up first and after the associated passengers were taken in account there were never enough foot passengers to make up to the maximum.   But most of the capacity increase on the Manxman (237 cars, 948 pax) has been in extra pax.  There's also space for 75 trailers, some of which could be used for busy periods for extra car space, but it seems an odd priority, unless they're hoping to do much more from Liverpool.  And if that's the case it would mean running a separate freight operation.

Presumable the pax / vehicle capacity ratios change very significantly at the times of year when the boats are crammed with bikes and bikers, with everything at premium fares?

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...