GD4ELI Posted May 19, 2020 Share Posted May 19, 2020 10 minutes ago, Andy Onchan said: You couldn't make it up.... you really couldn't! Oh you could, but no-one would believe you. Quote Link to comment Share on other sites More sharing options...
WTF Posted May 19, 2020 Share Posted May 19, 2020 marvelous, i didn't see a water feature on the prom plans ? 3 Quote Link to comment Share on other sites More sharing options...
Ďouglas Peel Posted May 19, 2020 Share Posted May 19, 2020 On 5/18/2020 at 2:18 PM, Andy Onchan said: Brown envelopes? Do you think Bacs transfer has done away with "Brown envelopes" ? Quote Link to comment Share on other sites More sharing options...
Albert Tatlock Posted May 19, 2020 Share Posted May 19, 2020 3 hours ago, TheTeapot said: That'll be Laxey flooded again. 1 Quote Link to comment Share on other sites More sharing options...
Neil Down Posted May 19, 2020 Share Posted May 19, 2020 31 minutes ago, Albert Tatlock said: That'll be Laxey flooded again. From Douglas prom?? Quote Link to comment Share on other sites More sharing options...
slinkydevil Posted May 19, 2020 Author Share Posted May 19, 2020 12 minutes ago, Neil Down said: From Douglas prom?? 1 Quote Link to comment Share on other sites More sharing options...
Andy Onchan Posted May 20, 2020 Share Posted May 20, 2020 14 hours ago, Ďouglas Peel said: Do you think Bacs transfer has done away with "Brown envelopes" ? I very much doubt it. Quote Link to comment Share on other sites More sharing options...
TheTeapot Posted May 20, 2020 Share Posted May 20, 2020 BACS is too easy to track for corruption. They do it with bitcoin now. Quote Link to comment Share on other sites More sharing options...
Neil Down Posted May 20, 2020 Share Posted May 20, 2020 14 hours ago, slinkydevil said: piss poor one... Quote Link to comment Share on other sites More sharing options...
2112 Posted May 21, 2020 Share Posted May 21, 2020 This Promenade works is quite something. Not content with closing down most of the Promenade and screwing up livelihoods, which have been decimated even more due to Coronavirus. The DOIdiots are closing Broadway up to Derby Road for 5 months. I feel sorry for the businesses, restaurants and takeaways. The Mannin Hotel must be in despair, head in hands. https://www.manxradio.com/news/isle-of-man-news/broadway-to-shut-for-five-months/ Yes access is granted to properties but a diversion to get to other area of Broadway and Victoria Road. Wasn’t Broadway dug up not so long ago? Or is it a permanent DOIdiots job creation scheme? Quote Link to comment Share on other sites More sharing options...
Nellie Posted May 21, 2020 Share Posted May 21, 2020 27 minutes ago, 2112 said: This Promenade works is quite something. Not content with closing down most of the Promenade and screwing up livelihoods, which have been decimated even more due to Coronavirus. The DOIdiots are closing Broadway up to Derby Road for 5 months. I feel sorry for the businesses, restaurants and takeaways. The Mannin Hotel must be in despair, head in hands. https://www.manxradio.com/news/isle-of-man-news/broadway-to-shut-for-five-months/ Yes access is granted to properties but a diversion to get to other area of Broadway and Victoria Road. Wasn’t Broadway dug up not so long ago? Or is it a permanent DOIdiots job creation scheme? The whole thing is totally mental! It's 20 months since they started, and apart from the pavement outside the old Villiers site, and bits of the pink tramlines near Derby Castle, nothing is actually finished. Most of it is nowhere near finished. Yet, they just dig up more and more sections. Not only is Broadway being closed, but we're all now driving, single file, on the pavement at The Esplanade, so they can put in the bit where the tramlines will converge to single track. That will take months and months to complete. And Harmer seriously thinks this will be finished by next March? He's just swallowed more lies and bullshit from his officers, who just want to kick the can down the road, and put off their day of reckoning. Quote Link to comment Share on other sites More sharing options...
monasqueen Posted May 21, 2020 Share Posted May 21, 2020 It's another case of... You couldn't make it up. They have got lots of modern digging and roadlaying equipment. How long do they need ??? In 1893, with little more than shovels, and probably a few sticks of gelignite to clear some of the rocky bits, the Victorians managed to build the Manx Electric Railway, AND adjacent roadway, between Strathallan and Groudle. Work began in Spring 1893, and the service started on 3 September 1893. Oh, and in the time, they managed to build the car sheds at Derby Castle, too. Why can't they now manage to get a few hundred yards of road and track relaid the other way, through to the Sea Terminal, in less than what seems like a decade? 3 1 Quote Link to comment Share on other sites More sharing options...
TheTeapot Posted May 21, 2020 Share Posted May 21, 2020 When they open it in 4 months 2 weeks they can tell you how great they are for finishing it early. 1 Quote Link to comment Share on other sites More sharing options...
ellanvannin2010 Posted May 21, 2020 Share Posted May 21, 2020 29 minutes ago, monasqueen said: It's another case of... You couldn't make it up. They have got lots of modern digging and roadlaying equipment. How long do they need ??? In 1893, with little more than shovels, and probably a few sticks of gelignite to clear some of the rocky bits, the Victorians managed to build the Manx Electric Railway, AND adjacent roadway, between Strathallan and Groudle. Work began in Spring 1893, and the service started on 3 September 1893. Oh, and in the time, they managed to build the car sheds at Derby Castle, too. Why can't they now manage to get a few hundred yards of road and track relaid the other way, through to the Sea Terminal, in less than what seems like a decade? 7th September actually and they also built a power station too I imagine the ratio of workers to managers was somewhat different then though 3 Quote Link to comment Share on other sites More sharing options...
The Dog's Dangly Bits Posted May 21, 2020 Share Posted May 21, 2020 1 hour ago, 2112 said: This Promenade works is quite something. Not content with closing down most of the Promenade and screwing up livelihoods, which have been decimated even more due to Coronavirus. The DOIdiots are closing Broadway up to Derby Road for 5 months. I feel sorry for the businesses, restaurants and takeaways. The Mannin Hotel must be in despair, head in hands. https://www.manxradio.com/news/isle-of-man-news/broadway-to-shut-for-five-months/ Yes access is granted to properties but a diversion to get to other area of Broadway and Victoria Road. Wasn’t Broadway dug up not so long ago? Or is it a permanent DOIdiots job creation scheme? How will the Mannin be in despair? It caused more than enough road chaos and inconvenience to build it (which is where you probably think it was dug up before). You can still access the hotel. You might have to walk fifty yards. Hardly life changing. The restaurants on Broadway are mainly busy through bookings rather than walk ins. Home Run pizza are mainly delivery. Its three and a half months too 3 Quote Link to comment Share on other sites More sharing options...