As Bill Shimmins MHK, a keen cyclist himself, advises cyclists not to use the Glencrutchery Rd cycle lane, branding it "dangerous and intimidating" (MR online) :lol:

You couldn't make it up.

 

  • Like 2
Link to comment
Share on other sites

Just now, TheTeapot said:

What, to plan a tram system that doesn't exist, that there is no call for,  and to do it in secret contributing to the entirely predictable massive fuck up?

?? Tram systen does exist just a extra route. heavier rails put in means its totally feasible to extend the route . Good idea for once 

Link to comment
Share on other sites

6 minutes ago, Numbnuts said:

?? Tram systen does exist just a extra route. heavier rails put in means its totally feasible to extend the route . Good idea for once 

Well I was more referring to the speculated Birch Hill - Farmhill Light Rail project that is utter utter pie in the sky bollocks.

  • Like 1
Link to comment
Share on other sites

Was this what our politicians voted for and approved?

Are the vehicle carriageways wide enough to accommodate vehicles and the trams on their right hand sides?

Edited by Non-Believer
Typo
Link to comment
Share on other sites

15 minutes ago, TheTeapot said:

What, to plan a tram system that doesn't exist, that there is no call for,  and to do it in secret contributing to the entirely predictable massive fuck up?

Aye.... but here's the thing....... the old Summerland site will be turned into a park & ride (car park) for those commuting into Douglas. 

Link to comment
Share on other sites

11 minutes ago, Non-Believer said:

Was this what our politicians voted for and approved?

Are the vehicle carriageways wide enough to accommodate vehicles and the trams on their right hand sides?

I have posted this before but according to the DOI ( who are never wrong  )there will more space in some cases and never less. Not sure about what width they have taken for a vehicle though, no doubt a matchbox toy car.

http://www.iomtoday.co.im/article.cfm?id=48953&headline=More space for trams and traffic insists DoI&sectionIs=NEWS&searchyear=2019

The two tram tracks are about a foot further apart which if it was necessary, which it is not, could have been easily accommodated by reducing the large pavement width by 6" on each side.

 

Edited by ellanvannin2010
Link to comment
Share on other sites

10 minutes ago, Andy Onchan said:

Aye.... but here's the thing....... the old Summerland site will be turned into a park & ride (car park) for those commuting into Douglas. 

Park and ride on the Isle of Man should mean leaving your car at home and getting the bus. You could well be right though, nothing is ever going to built there so a massive car park will do.

Link to comment
Share on other sites

4 minutes ago, TheTeapot said:

Park and ride on the Isle of Man should mean leaving your car at home and getting the bus. You could well be right though, nothing is ever going to built there so a massive car park will do.

I suggested that scenario not long after Summerland was demolished.

It's actually a huge site but with the potential issue of an unstable cliff face costing long millions to secure the only people paying for that will be the taxpayer (where's there's a bottomless pit always available.

Edited by Andy Onchan
Link to comment
Share on other sites

37 minutes ago, Numbnuts said:

Also why the gap between the sets of tracks is bigger . Electric trams are a bigger unit i'd say . All coming out in the wash now !!!! Clearly the plan all along just not honest enough to admit it . Hence the rails !! 

Rails came secondhand from a failed plan in Birkenhead for some riverfront development. I think at the time they got them for a good price. They are far heavier than required for Horse cars or MER trams but if the price was better than buying new then that is good I guess.

You can certainly buy modern trams that do not require overhead wires ( Birmingham is getting some). They do look nice and the DOI like an extravagant project

https://www.transport-network.co.uk/New-84m-battery-powered-trams-are-a-game-changer/16197

The plan for the  tramway extending down to the old courthouse in Ramsey seems to have gone very quiet:devil:

Link to comment
Share on other sites

3 minutes ago, ellanvannin2010 said:

The plan for the  tramway extending down to the old courthouse in Ramsey seems to have gone very quiet:devil:

It will have done unless they're planning on demolishing half the buildings at the southern end of Parliament St in order to do it. Plus ripping up all the expensive Chinese granite that's only been down 5-odd years.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...