Numbnuts Posted January 16, 2020 Share Posted January 16, 2020 (edited) 2 minutes ago, Nellie said: Richard Butt and his people are gonna love this! £1 million......... Who is AB? Anyone who’d even mention this, knowing that minutes will be published for scrutiny, should be Sectioned. IJL I think is Longworth N Black CEO DOI J Robinson Director of Highway services P Singer Director of projects J Reece Chief Engineer A Burrows Project Manager K Podmore Design Team Leader G Saunders Construction Manager Edited January 16, 2020 by Numbnuts Quote Link to comment Share on other sites More sharing options...
Dave Hedgehog Posted January 16, 2020 Share Posted January 16, 2020 Interesting admission later on that they are overstretched people wise and are looking to get people from the UK to work on the sheltered housing they are doing in Peel so they can shunt the people there onto the prom. 1 Quote Link to comment Share on other sites More sharing options...
thesultanofsheight Posted January 16, 2020 Share Posted January 16, 2020 2 hours ago, Numbnuts said: Could it actually get any worse !! So all that fuss and expense to have two tram tracks would seen a complete waste as they ' forgot' or whatever to include signals to enable it to happen. So now maybe it's one tram at any one time on the tracks .. how long for a journey up and down the prom ! Some service this is going to be .unbelievable really .Bet the powers that be are glad they started this FFS they lunge from one disastrous situation to another. It just shows that they have no actual strategy or plan and are just making it up on the hoof. 1 Quote Link to comment Share on other sites More sharing options...
Numbnuts Posted January 16, 2020 Share Posted January 16, 2020 (edited) 13 minutes ago, thesultanofsheight said: FFS they lunge from one disastrous situation to another. It just shows that they have no actual strategy or plan and are just making it up on the hoof. That's what I was actually told and if you read the full minutes on My Prom site it would seem that Auldyn are suggesting when pushed for a timetable that they are still waiting for specific detailed design plans from DOI . This was what I'd been told in November by contractor in the know and it's all been born out since . Apparently they had concept plans...but no detailed ones to give to the contractor hence one of the reasons for slow pace . Edited January 16, 2020 by Numbnuts 1 Quote Link to comment Share on other sites More sharing options...
finlo Posted January 16, 2020 Share Posted January 16, 2020 19 minutes ago, thesultanofsheight said: FFS they lunge from one disastrous situation to another. It just shows that they have no actual strategy or plan and are just making it up on the hoof. The tram horses hoof at that! Quote Link to comment Share on other sites More sharing options...
Non-Believer Posted January 16, 2020 Share Posted January 16, 2020 (edited) Inquiry time. Cease work. Find out what's gone wrong (must be fairly obvious to all by now). Dismiss some people forthwith as examples and bring some UK Contractors in. Before this scandalous exhibition of Public Office incompetence consumes any more money for zero return other than a laughing stock construction. And do it NOW. ETA. And we've got Chris Thomas MHK posting on these boards telling us how everything's tickety-boo in Government and its finances. Edited January 16, 2020 by Non-Believer Extra bit 5 1 Quote Link to comment Share on other sites More sharing options...
thesultanofsheight Posted January 16, 2020 Share Posted January 16, 2020 11 minutes ago, Numbnuts said: That's what I was actually told and if you read the full minutes on My Prom site it would seem that Auldyn are suggesting when pushed for a timetable that they are still waiting for specific detailed design plans from DOI . This was what I'd been told in November by contractor in the know and it's all been born out since . Apparently they had concept plans...but no detailed ones to give to the contractor hence one of the reasons for slow pace . It’s just dire. I mean everyone knew that they are a bunch of complete fucking idiots before this work even started but the general scale of their idiocy is still astounding as a lot of those minutes attest. The whole situation over the horse tram tracks should have got someone sacked but the reality is that they’ve actually promoted the guy who has fucked it up and sacked the people who were brought in to ease his transition out of the job instead. What do you actually have to do to get hoofed out of the DOI? Rape a cat in the middle of the road? Do a shit in Alf Cannan’s top drawer? Set fire to Howard Quayle’s house? They appear to have a plan for nothing other than how much money they can get away with spending and how much they can fuck everyone else around while they’re doing it. 1 2 1 Quote Link to comment Share on other sites More sharing options...
finlo Posted January 16, 2020 Share Posted January 16, 2020 26 minutes ago, Non-Believer said: Inquiry time. Cease work. Find out what's gone wrong (must be fairly obvious to all by now). Dismiss some people forthwith as examples and bring some UK Contractors in. Before this scandalous exhibition of Public Office incompetence consumes any more money for zero return other than a laughing stock construction. And do it NOW. ETA. And we've got Chris Thomas MHK posting on these boards telling us how everything's tickety-boo in Government and its finances. I wonder if CT has permission from the fat lad to be engaging with the plebs? Quote Link to comment Share on other sites More sharing options...
pongo Posted January 16, 2020 Share Posted January 16, 2020 (edited) Ditch the horse trams for good and get the tarmac done asap. Job done ✔ Edited January 16, 2020 by pongo 2 Quote Link to comment Share on other sites More sharing options...
Numbnuts Posted January 16, 2020 Share Posted January 16, 2020 (edited) If anyone reads the My Prom minutes youll see mention of legal discussions taking place with regard to the cracking . Also mention of increased costs accrued so it's going to get worse yet ! I was told that Auldyn had a guy over making notes hourly of any works carried out since the job ground to a halt vitually , of all the hourly rate work been done .. this is all going to cost someone ! Notice the mention of not discussing some aspects relative to costs due to confidentiallty . What a mess ! Edited January 16, 2020 by Numbnuts 3 Quote Link to comment Share on other sites More sharing options...
thesultanofsheight Posted January 16, 2020 Share Posted January 16, 2020 (edited) 10 minutes ago, Numbnuts said: I was told that Auldyn had a guy over making notes hourly of any works carried out since the job ground to a halt vitually , of all the hourly rate work been done .. this is all going to cost someone ! Notice the mention of not discussing some aspects relative to costs due to confidentiallty . What a mess ! It will be liability management. They probably think they are potentially on the hook for being blamed for the cock up’s on a project of this size and value so it’s probably now a bit of a Mexican stand off where they won’t do anything without photographing outcomes, and clear plans and direction as the financial downside will potentially be extreme. I’d guess that’s why nothing seems to have happened for months while they all argue over it all. Edited January 16, 2020 by thesultanofsheight 1 Quote Link to comment Share on other sites More sharing options...
Nellie Posted January 16, 2020 Share Posted January 16, 2020 7 minutes ago, Numbnuts said: If anyone reads the My Prom minutes youll see ............................ ................. that there were more people at that meeting, than actually working on the job! 2 2 Quote Link to comment Share on other sites More sharing options...
Neil Down Posted January 16, 2020 Share Posted January 16, 2020 43 minutes ago, thesultanofsheight said: It’s just dire. I mean everyone knew that they are a bunch of complete fucking idiots before this work even started but the general scale of their idiocy is still astounding as a lot of those minutes attest. The whole situation over the horse tram tracks should have got someone sacked but the reality is that they’ve actually promoted the guy who has fucked it up and sacked the people who were brought in to ease his transition out of the job instead. What do you actually have to do to get hoofed out of the DOI? Rape a cat in the middle of the road? Do a shit in Alf Cannan’s top drawer? Set fire to Howard Quayle’s house? They appear to have a plan for nothing other than how much money they can get away with spending and how much they can fuck everyone else around while they’re doing it. Rob Callister supplied some kind of response that was posted back on Dec 10th. Every day that passes makes a mockery of the DoI's responses Quote Link to comment Share on other sites More sharing options...
thesultanofsheight Posted January 16, 2020 Share Posted January 16, 2020 3 minutes ago, Neil Down said: Rob Callister supplied some kind of response that was posted back on Dec 10th. Every day that passes makes a mockery of the DoI's responses Do you have a link to that? I agree every day that nothing is said makes them look incompetent. Quote Link to comment Share on other sites More sharing options...
yootalkin2me Posted January 16, 2020 Share Posted January 16, 2020 Force Majeure? Quote Link to comment Share on other sites More sharing options...