Two lots of Strategic Board minutes have been added to the website for April and May.

https://s3-eu-west-1.amazonaws.com/myprom.im/21-05-07-signed-douglas-promenade-project-board-minutes_redacted.pdf

https://s3-eu-west-1.amazonaws.com/myprom.im/21-04-09-signed-douglas-promenade-project-board-minutes_redacted.pdf

A few highlights:-

  • The target date for completion is 28/8, but Black insists it should be 26/8 ahead of the bank holiday weekend.
  • They still don't have an acceptable solution to the cracked concrete.
  • Siemens have given up trying to design a traffic light solution for the trams.
  • There was nothing wrong with the rail lines that were ripped up - the problem was with the welding.

 

 

  • Like 2
Link to comment
Share on other sites

50 minutes ago, Nellie said:

Two lots of Strategic Board minutes have been added to the website for April and May.

https://s3-eu-west-1.amazonaws.com/myprom.im/21-05-07-signed-douglas-promenade-project-board-minutes_redacted.pdf

https://s3-eu-west-1.amazonaws.com/myprom.im/21-04-09-signed-douglas-promenade-project-board-minutes_redacted.pdf

A few highlights:-

  • The target date for completion is 28/8, but Black insists it should be 26/8 ahead of the bank holiday weekend.
  • They still don't have an acceptable solution to the cracked concrete.
  • Siemens have given up trying to design a traffic light solution for the trams.
  • There was nothing wrong with the rail lines that were ripped up - the problem was with the welding.

 

 

What is the "Bus stops being extended" all about? The bump outs looked finished last time I saw them?

Link to comment
Share on other sites

11 minutes ago, Boris Johnson said:

What is the "Bus stops being extended" all about? The bump outs looked finished last time I saw them?

These minutes are produced April and May and represent months before that I'd say . Interestingly there not optimistic for finishing on August 28th and I would agree they have no chance. Nothing much flagged up on quality of work either which worries me as in many areas not addressed its terrible. 

Edited by Numbnuts
Link to comment
Share on other sites

2 hours ago, Nellie said:

 

  • Siemens have given up trying to design a traffic light solution for the trams.

No traffic lights - no horse trams? Given that the lack of the traffic lights was flagged up as a significant failing and non-modern compliant previously?

  • Like 1
Link to comment
Share on other sites

1 hour ago, Numbnuts said:

These minutes are produced April and May and represent months before that I'd say

The minutes are for the date shown. They aren't published until they have been approved at the next meeting, checked and any redactions made.

Link to comment
Share on other sites

1 hour ago, doc.fixit said:

There appears to be a lot of parking disappeared, the town shops will continue to die if that is the case.

The lack of diagonal on the sea side means about 50% gone there and the hotel side seems to be taxis, buses and loading so Yes, lots of parking gone.....

Link to comment
Share on other sites

8 minutes ago, Boris Johnson said:

The lack of diagonal on the sea side means about 50% gone there and the hotel side seems to be taxis, buses and loading so Yes, lots of parking gone.....

all done to get you paying in the car parks.

  • Like 1
Link to comment
Share on other sites

28 minutes ago, Non-Believer said:

No traffic lights - no horse trams? Given that the lack of the traffic lights was flagged up as a significant failing and non-modern compliant previously?

Would they of had to have traffic lights/signaling system if the horse tram tracks were kept completely separate to road?

Or are they a requirement of going from double to single lane?

 

Link to comment
Share on other sites

27 minutes ago, Boris Johnson said:

The lack of diagonal on the sea side means about 50% gone there and the hotel side seems to be taxis, buses and loading so Yes, lots of parking gone.....

The diagonal parking and narrowed carriageway is going to be an insurance claim hotspot

Link to comment
Share on other sites

4 minutes ago, Boris Johnson said:

There is no diagonal parking on the new layout!

Parallel parking only! That will be fun for the cant drive lot.

There is opposite the bus stop on Loch Prom 

 

The plans over on MyProm website has a few bays of parallel parking along Loch Prom. It's going to be narrow.

Edited by AlanShimmin
  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...