Happier diner Posted March 18, 2022 Share Posted March 18, 2022 https://www.manxradio.com/news/isle-of-man-news/red-concrete-issue-has-got-to-be-resolved-says-doi-minister/ I only counted 1 "hopefully" Is that good or does it mean even "hope" is starting to run out? Quote Link to comment Share on other sites More sharing options...
Roger Mexico Posted March 18, 2022 Share Posted March 18, 2022 4 minutes ago, Happier diner said: https://www.manxradio.com/news/isle-of-man-news/red-concrete-issue-has-got-to-be-resolved-says-doi-minister/ I only counted 1 "hopefully" Is that good or does it mean even "hope" is starting to run out? Hope dies last they say, but "hopefully" seems to outlast even that. Still Tim has reassured us that the traffic lights at Ballacraine have been altered so that those coming from Peel and those coming from Kirk Michael will have more time. Quote Link to comment Share on other sites More sharing options...
Numbnuts Posted March 18, 2022 Share Posted March 18, 2022 Nothing though about the Tram lines being finished at bottom of Broadway. Another prolonged exercise in incompetence as it was supposed to be finished by end of March. My guess is theres really bad news to be announced due to Longworths involvement and signals and gaps between rails etc. 1 Quote Link to comment Share on other sites More sharing options...
Two-lane Posted March 18, 2022 Share Posted March 18, 2022 33 minutes ago, Numbnuts said: Nothing though about the Tram lines being finished at bottom of Broadway. Another prolonged exercise in incompetence as it was supposed to be finished by end of March From the latest Strategic Board Minutes: 1 1 Quote Link to comment Share on other sites More sharing options...
0bserver Posted March 18, 2022 Share Posted March 18, 2022 25 minutes ago, Two-lane said: From the latest Strategic Board Minutes: Just cancel the 2022 'season' and save us all some money. Tesco will probably take the horses off Ian's hands. 1 Quote Link to comment Share on other sites More sharing options...
Numbnuts Posted March 18, 2022 Share Posted March 18, 2022 (edited) 1 hour ago, Two-lane said: From the latest Strategic Board Minutes: So looks to me that going on the minutes and Longworth timescale the Trams are not going to run this side of TT even with rail inspectors agreement. That isnt a given as noted in the freedom of information request involving the signals and gaps in the rails. The gift that keeps on giving . Edited March 18, 2022 by Numbnuts 1 Quote Link to comment Share on other sites More sharing options...
Boris Johnson Posted March 18, 2022 Share Posted March 18, 2022 30 minutes ago, Numbnuts said: So looks to me that going on the minutes and Longworth timescale the Trams are not going to run this side of TT even with rail inspectors agreement. That isnt a given as noted in the freedom of information request involving the signals and gaps in the rails. The gift that keeps on giving . Longworth will have sold millions of tickets to the island on the understanding that the ticket holders must ride the horse trams. He said this before but surprisingly could not produce evidence to back it up. He needs to be gelded.....................Once and for all and put out to grass 2 Quote Link to comment Share on other sites More sharing options...
Amadeus Posted March 19, 2022 Share Posted March 19, 2022 All that effort for something they should have included in the first place. 1 Quote Link to comment Share on other sites More sharing options...
Numbnuts Posted March 19, 2022 Share Posted March 19, 2022 Thats a total mess. Would any of you accept that level of finish on a job on your house ?? I certainly wouldn't. 3 Quote Link to comment Share on other sites More sharing options...
Boris Johnson Posted March 19, 2022 Share Posted March 19, 2022 21 minutes ago, Amadeus said: All that effort for something they should have included in the first place. Sorry Amedeus, what are we looking at? Horse droppings? Quote Link to comment Share on other sites More sharing options...
Amadeus Posted March 19, 2022 Share Posted March 19, 2022 The new roadworks seems to be so this buffer/filler/rubber thingy can be inserted between the rails and the concrete. They cut a groove and apply it all along the tracks on both sides. 1 Quote Link to comment Share on other sites More sharing options...
Boris Johnson Posted March 19, 2022 Share Posted March 19, 2022 (edited) 8 minutes ago, Amadeus said: The new roadworks seems to be so this buffer/filler/rubber thingy can be inserted between the rails and the concrete. They cut a groove and apply it all along the tracks on both sides. As an aside, that looks like the groove is nearly as wide as the rail that the tram wheels run on? FFS that should be fun come TT week.................. I know thew points are too big for horse hooves but this is bloody dangerous all year round for bikes, both self propelled and motor type. Edited March 19, 2022 by Boris Johnson 2 Quote Link to comment Share on other sites More sharing options...
Two-lane Posted March 19, 2022 Share Posted March 19, 2022 23 minutes ago, Numbnuts said: that level of finish on a job on your house Don't be silly. It isn't finished yet. Quote Link to comment Share on other sites More sharing options...
Non-Believer Posted March 19, 2022 Share Posted March 19, 2022 1 hour ago, Boris Johnson said: Sorry Amedeus, what are we looking at? Horse droppings? It's the new shock absorbing/anti-vibration membrane that's now being installed as an afterthought; to protect the brittle concrete adjacent to the iron rail from vibration that could cause the concrete to fracture (as if they haven't got enough problems with cracking concrete). The same thing that everybody said should have been incorporated into the original build. 3 Quote Link to comment Share on other sites More sharing options...
Two-lane Posted March 19, 2022 Share Posted March 19, 2022 1 hour ago, Amadeus said: The new roadworks seems to be so this buffer/filler/rubber thingy can be inserted between the rails and the concrete. They cut a groove and apply it all along the tracks on both sides. If that is concrete they have allowed to set in the rail groove, they will have to chisel it out. Quote Link to comment Share on other sites More sharing options...