Jump to content

Windfarm could cost up to £40 million


Major Rushen

Recommended Posts

47 minutes ago, Andy Onchan said:

T'other way around is what I understand.

You misunderstood then. The zero carbon solution is to use on island solar/wind with the difference being wind/solar/nuclear via the interconnenectors. Power station to be de commissioned in 2030.

Of course none of this will actually happen. 

Link to comment
Share on other sites

20 minutes ago, Happier diner said:

You misunderstood then. The zero carbon solution is to use on island solar/wind with the difference being wind/solar/nuclear via the interconnenectors. Power station to be de commissioned in 2030.

Of course none of this will actually happen. 

Probably not.

Link to comment
Share on other sites

31 minutes ago, Happier diner said:

You misunderstood then. The zero carbon solution is to use on island solar/wind with the difference being wind/solar/nuclear via the interconnenectors. Power station to be de commissioned in 2030.

Of course none of this will actually happen. 

We don't have £1.3 billion to spend on it.  Govt is scrapping round trying to save £10 million ffs.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...